19-01-2024, 04:11 PM
Hello Dr. Antti
Happy New Year. I hope you are doing well.
I am developing a standalone power model for India and want to add pumped hydro energy storage technology. I have the following data to define my technology.
Overall Plant Efficiency 74%
full load operation in generating mode 6 hrs/day
CYCLE EFFICIENCY 76%
AUXILIARY CONSUMPTION 1%
PLANNED OUTAGE 10 days
Total Potential 97 GW
Capacity till 2020 3 GW
Technical lifetime 40 years
Construction time 8 years
Charging efficiency 80%
Ramp Up Rate 50% of Full Load/Minute
Ramp Down Rate 50% of Full Load/Minute
Capital Cost 935 USD/PJ
Fixed O&M 23 USD/PJ/yr
So, I have added a process where I have defined the following parameters.
Parameter Item 5/6 2020 2030
CAP_BND FX 2.6
CAP_BND UP 20
NCAP_AFC DAYNITE 0.33 0.33
NCAP_BND UP 20
NCAP_COST 935 935
NCAP_FOM 23 23
NCAP_ILED -8 -8
NCAP_TLIFE 40 40
STG_CHRG 0.95 0.95
STG_EFF 0.9 0.9
STG_LOSS 0.03 0.03
The model horizon is extended till 2070, and I have the following queries:
Happy New Year. I hope you are doing well.
I am developing a standalone power model for India and want to add pumped hydro energy storage technology. I have the following data to define my technology.
Overall Plant Efficiency 74%
full load operation in generating mode 6 hrs/day
CYCLE EFFICIENCY 76%
AUXILIARY CONSUMPTION 1%
PLANNED OUTAGE 10 days
Total Potential 97 GW
Capacity till 2020 3 GW
Technical lifetime 40 years
Construction time 8 years
Charging efficiency 80%
Ramp Up Rate 50% of Full Load/Minute
Ramp Down Rate 50% of Full Load/Minute
Capital Cost 935 USD/PJ
Fixed O&M 23 USD/PJ/yr
So, I have added a process where I have defined the following parameters.
Parameter Item 5/6 2020 2030
CAP_BND FX 2.6
CAP_BND UP 20
NCAP_AFC DAYNITE 0.33 0.33
NCAP_BND UP 20
NCAP_COST 935 935
NCAP_FOM 23 23
NCAP_ILED -8 -8
NCAP_TLIFE 40 40
STG_CHRG 0.95 0.95
STG_EFF 0.9 0.9
STG_LOSS 0.03 0.03
The model horizon is extended till 2070, and I have the following queries:
- I wanted to add cycle efficiency with STG_MAXCYC, but I couldn't find that in my parameter list (my TIMES version 6.9.24)
- How could I model ramp up and down rate for this process, and what are the parameters?
- How could I add 'full load operation in the generating mode' and overall plant efficiency?
- With the above parameters, I was able to run the model, and in the results, I only got capacity numbers for this process but NO Activity nor VAR FLO OUT. Why is the process not generating even if it has capacity?