03-12-2020, 09:55 PM
(This post was last modified: 03-12-2020, 10:15 PM by Antti-L.
Edit Reason: add
)
Yes, of course the UC_COMPRD (with the % parameter) is defined on the LHS for each single region and not on their sum. But all the terms on the LHS and RHS are summed over regions. So for a minimum renewable share constraint we get (simplified, for each period t):
SUM((r,p,c), VAR_FLO(r,t,p,c)) ≥ SUM((r,c), Share(t) × VAR_COMPRD(r,t,c))
Here, c is member of the electricity commodities. This translates into: Production of renewable electricity over all regions must be at least Share(t) × Production of all electricity produced over all regions.
So, as far as I can see it is exactly as you would want?
To put this in another way: Here you just need to define the same Share-% value for the UC_COMPRD coefficient in all regions, and not define different values for each region. Easy enough?
SUM((r,p,c), VAR_FLO(r,t,p,c)) ≥ SUM((r,c), Share(t) × VAR_COMPRD(r,t,c))
Here, c is member of the electricity commodities. This translates into: Production of renewable electricity over all regions must be at least Share(t) × Production of all electricity produced over all regions.
So, as far as I can see it is exactly as you would want?
To put this in another way: Here you just need to define the same Share-% value for the UC_COMPRD coefficient in all regions, and not define different values for each region. Easy enough?