20-04-2019, 11:46 AM
(19-04-2019, 10:50 PM)Antti-L Wrote: No, it should not be possible (if the process is defined to be of type CHP). Note that if you define CEH=1, the activity and capacity represent the total energy output (power+heat) in full CHP mode, as described in the documentation.
Can you maybe provide the model input files (*.DD and *.RUN) for investigating why you have the issue, or is there anything else I could do to help with the issue?
[EDIT:] I just tested it for a test process "MYCHP" of type CHP, using the parameters you have given:
NCAP_CHPR(REG,2010,MYCHP,FX)= 1.47;
NCAP_CEH(REG,2010,MYCHP) = 1;
In the results, the outputs were electricity and heat exactly in the fixed proportions defined, as expected. So, I cannot confirm your findings.
Thanks for your quick reply. I have attached a screenshot of the processes I have defined in my input sheet (just for reference). These processes could be seen in detail in the sub_RES file I am attaching. I am very new to TIMES. I don't know where to find .DD and .RUN file. I can give all the required excel sheets if you want (base year template, SysSettings file etc.)