08-04-2019, 06:58 PM
It is the same issue with the life time of electrolysis and batteries. Personally, I address this in a simplified manner, by including several processes, of example PEMs, with different model input on annual availability, efficiency and life time. For example, a process with AFA=1 has a lower life time than a process with AFA=0.5.
